How It’s Done of the Day: A mere six days after repair work began on an earthquake-demolished section of the Great Kanto Highway in Naka the road was ready to be reopened.
[dailymail.]
wow…. impressive.
and it takes years/months for construction in the u.s.
Dude, can they do this in Marcos Highway?
^ what Joey said. haha.
(Source: thedailywhat)
![thefloatingvibes:
emmajayy:
jamiequiambao:
thedailywhat:
How It’s Done of the Day: A mere six days after repair work began on an earthquake-demolished section of the Great Kanto Highway in Naka the road was ready to be reopened.
[dailymail.]
wow…. impressive.
and it takes years/months for construction in the u.s.
Dude, can they do this in Marcos Highway?
^ what Joey said. haha.](http://24.media.tumblr.com/tumblr_likon8rZEo1qzpwi0o1_400.jpg)